This technical report describes the improvement interventions made on the lay-out used for the high resistance measurements performed in the laboratory Cp 107. The interventions include the revision of electrical systems to the electrical safety regulations and the reduction of electromagnetic noise with improvements ground connections. Also it was implemented an improvement of the environmental conditioning system inside the screened room, it was improved the remote control of the experiment to contain operations in the presence of high electrical potentials and it was mitigated the disturbances to the experiment in progress.
Questo rapporto tecnico descrive gli interventi migliorativi operati sul nuovo allestimento sperimentale impiegato per le misure di alta resistenza eseguite nel laboratorio Cp 107. Gli interventi comprendono l’adeguamento degli impianti elettrici alla normativa sulla sicurezza elettrica e la riduzione del rumore elettromagnetico con i miglioramenti dei collegamenti di terra. Inoltre, sono stati effettuati il ripristino del sistema di condizionamento ambientale all'interno della camera schermata, il controllo dell’esperimento da remoto per contenere le operazioni in presenza di potenziali elettrici elevati, per mitigare i disturbi all'esperimento in corso.
Allestimento del laboratorio Cp107 per misure in corrente continua di alto valore di resistenza elettrica / Mihai, I.; Francese, C.. - (2021).
Allestimento del laboratorio Cp107 per misure in corrente continua di alto valore di resistenza elettrica
Mihai I.
Writing – Review & Editing
;Francese C.Software
2021
Abstract
This technical report describes the improvement interventions made on the lay-out used for the high resistance measurements performed in the laboratory Cp 107. The interventions include the revision of electrical systems to the electrical safety regulations and the reduction of electromagnetic noise with improvements ground connections. Also it was implemented an improvement of the environmental conditioning system inside the screened room, it was improved the remote control of the experiment to contain operations in the presence of high electrical potentials and it was mitigated the disturbances to the experiment in progress.File | Dimensione | Formato | |
---|---|---|---|
RT-2021-16.pdf
solo utenti autorizzati
Descrizione: Questo rapporto tecnico descrive gli interventi migliorativi operati sul nuovo allestimento sperimentale impiegato per le misure di alta resistenza eseguite nel laboratorio Cp 107.
Tipologia:
final published article (publisher’s version)
Licenza:
Non Pubblico - Accesso privato/ristretto
Dimensione
1.44 MB
Formato
Adobe PDF
|
1.44 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.